Modernism in Sydney

Where modernism came from, who brought it to Sydney, how shortages, councils, height rules, the sun and the landscape changed it, and what has since been demolished or listed.

Where it came from

Modern architecture took shape among European architects working from the first decade of the twentieth century to the 1930s. They rejected historical styles and largely abandoned ornament. They favoured framed structures of reinforced concrete, steel and glass, which allowed open plans. Their buildings tended to be asymmetrical, were meant to be seen as free-standing objects, and showed their internal functions on the outside. Many of these architects saw design as a means of social reform.

One centre of these ideas was the Bauhaus. Walter Gropius founded the school in Weimar in 1919. It moved to Dessau in 1925 and to Berlin in 1932, and closed in 1933 under Nazi pressure. Le Corbusier’s work matured during the 1920s, and his concrete buildings after the Second World War later informed Brutalism.

The name International Style comes from an exhibition held at the Museum of Modern Art in New York in 1932, curated by Henry-Russell Hitchcock and Philip Johnson. It presented lightweight construction, modern materials and flexible planning as the essence of the movement, and largely passed over the social concerns of the Europeans. Gropius, Mies van der Rohe and Marcel Breuer moved to America as the Nazis rose to power. By the 1950s the American version had become corporate, typified by the tall office block in a skin of aluminium and glass. Sydney took up both lines: European ideas arrived through people, and the American office tower followed.

How it reached Sydney

The first route was through Australians working abroad. In the 1930s many young architects travelled to work and study, mostly in England. Sydney Ancher, Arthur Baldwinson, Walter Bunning and Morton Herman were among those who came back to promote the new architecture. Ancher travelled in Europe from 1930 to 1936 and brought home flat roofs and strong, clear rectangular shapes, rendered in white. Baldwinson worked in London for Maxwell Fry and returned in 1936.

The second route was migration. Some 8,000 European refugees reached Australia before the war, and they included architects who had studied and practised modern architecture. Hans Peter Oser and Hugo Stossel both trained in Vienna and arrived in 1938. Henry Epstein built at Pymble and Roseville in 1947, and Hugh Buhrich, a refugee from Germany, at Castlecrag from 1948.

Harry Seidler arrived in 1948. Born in Vienna in 1923, he was interned in Britain and Canada as an enemy alien, studied at the University of Manitoba, then studied under Gropius at Harvard. The Bauhaus closed while he was still a child, so his connection to it ran through his teachers: Gropius, Breuer, and Josef Albers, under whom he studied at Black Mountain College. He worked as Breuer’s assistant in New York and spent some weeks with Oscar Niemeyer in Brazil on the way to Australia.

His parents had invited him to design them a house at Wahroonga. Rose Seidler House, built from 1948 to 1950, is a raised white box of timber and glass with a ramp, sandstone walls and bushland beside Ku-ring-gai Chase. It won the Sulman Medal in 1951, the first of five for Seidler, and it went on to influence domestic architecture in NSW.

Shortages and councils

The house was built in a period of conservative building regulations and scarce materials, skills and industrial processes. General building restrictions were lifted only in June 1952, with materials still scarce and costs high. Berger House in Elizabeth Street received its permit in 1951 on the condition that imported materials be used. Its planned window shading was dropped, and on completion around 1955 it gave Sydney its first lightweight curtain wall aesthetic.

Local councils were a further obstacle. The headlines followed him: “Council won’t pass modernistic roof” in 1949, and “Architect wins dispute over house design” in 1951. In 1952 he won an appeal against Ku-ring-gai Council’s refusal of a glass house at Roseville. His only course, he said later, was the Land and Valuation Court.

every time I designed a house and submitted it to local council it was refused on the grounds of design.

Harry Seidler, recorded in 1972, Hazel de Berg collection, National Library of Australia

The height limit and the plaza

From 1912 a statute limited buildings in Sydney to 150 feet (45.72 metres). An amending Act of 1957 widened the Minister’s power to approve greater heights, tied that power to floor space ratios, and set up a Height of Buildings Advisory Committee, which adopted a maximum ratio of 12:1. Caltex House had already exceeded the limit on a technicality arising from the levels across its site. The AMP Building was the first building to officially break it.

The AMP Society applied to exceed the limit in early 1957, with a design by Peddle Thorp & Walker. The building opened in 1962 as the tallest in Australia and the first free-standing skyscraper in NSW. It had a steel frame encased in concrete and a central core.

A boom followed. Between 1967 and 1969, 162 schemes with floor space ratios above 10:1 were approved, though many were never built.

Australia Square was the most celebrated civic initiative of the time, and it came from the private sector. Lend Lease amalgamated 30 sites and several narrow streets, and Harry Seidler & Associates designed the scheme with the Italian engineer Pier Luigi Nervi. The Plaza Building on Pitt Street was finished in 1964 and the 50-storey tower in 1967. The tower covers about a quarter of the block. Its round plan was chosen in response to setback regulations and to leave as much open space as possible, with a plaza reaching all four streets. Alexander Calder’s Crossed Blades was installed on the George Street forecourt, and a tapestry by Le Corbusier hung in the lift lobby.

Plazas then became a matter of regulation. A draft ordinance exhibited in the mid 1960s allowed bonuses for open space and pedestrian access that lifted the maximum ratio from 10:1 to 12:1. The Floor Space Ratio Code of December 1971 went further: bonuses for plazas, through-site links and retail frontages could raise a base ratio of 6:1 to as much as 12.5:1. The results were mixed: some plazas were underused, and small pocket plazas tended to erode the line of street facades and gave pedestrians little benefit.

Sun, bush and the Sydney School

Australian office blocks needed to respond to the sun, more so than in the northern hemisphere. The glass curtain wall reached Sydney from America in the 1950s. Qantas House, opened in 1957, was glazed above the ground floor in anti-actinic glass. Architects soon began to shade their buildings from outside. Bunning & Madden’s Liner House in Bridge Street, designed in 1958, added louvred sun hoods to its curtain wall and won the Sulman Medal in 1961.

Seidler’s first office building, designed in 1954 for Associated General Publications in Sussex Street and later known as Horwitz House, had full-height adjustable aluminium blades across its west face. It was among the city’s first serious attempts at sun control, and the idea came from Seidler’s time with Niemeyer, who had worked with Le Corbusier on the Ministry of Education and Health in Rio de Janeiro. In the 1960s Ken Woolley’s State Office Block set its windows well back behind the external columns, for a verandah effect.

The Sydney School

During the 1950s younger architects began to explore a local version of modernism in houses. The name dates from 1962, when Milo Dunphy wrote that their work “may soon be regarded as the Sydney School”. Its heyday ran from the mid 1950s to the early 1970s. These architects used brick, timber and stone on steep bush and coastal sites, often under raked roofs, and looked to Frank Lloyd Wright, traditional Japanese building and Alvar Aalto.

Peter Muller designed the Audette House at Castlecrag, of 1952 to 1953, after a Fulbright scholarship in America. He responded to the landscape and to Walter Burley Griffin’s plan for the suburb, using red brick, exposed hardwood and floor-to-ceiling glass. Ken Woolley’s house at Mosman of 1962 stepped down rock outcrops on a grid of twelve-foot squares. The approach spread to public buildings, as in Don Gazzard’s Wentworth Memorial Chapel at Vaucluse of 1965, on a rock outcrop above the harbour.

The group’s work was an expression of shared beliefs: open planning, response to sunlight and fresh air, and honest structure.

The Opera House

Premier Joseph Cahill released the international competition for a building on Bennelong Point on 15 February 1956, and entries closed that December. The competition drew more than 223 entries from 28 countries. The four assessors included Eero Saarinen. On 29 January 1957 Cahill named Design 218 by Jørn Utzon the winner. Utzon was a 38-year-old Dane who had worked briefly with Aalto and had met Wright and Mies on his travels. The assessors called his scheme “clearly a controversial design”.

The Opera House belongs to the more expressive modernism of the 1950s. It exemplifies the movement’s delight in structure, thin shell concrete in particular, and it pioneered the use of computers in design, in Ove Arup’s office.

Work began on 2 March 1959 with key parts of the design unresolved. The spherical solution for the roof came in late 1961, after about four years and twelve proposals for its curvature. The last of 2,194 precast shell segments was placed in January 1967. After the change of government in 1965 the minister, Davis Hughes, stopped payments to Utzon in a dispute over money for plywood prototypes. Hughes announced Utzon’s resignation on 28 February 1966. Utzon regarded himself as forced out, and he left Australia on 28 April and never returned.

A panel of Australian architects took over on 19 April: Peter Hall for design, Lionel Todd for documents and David Littlemore for supervision. Hall recommended a single-purpose concert hall and his team designed the theatres, interiors and glass walls, working within the arched superstructure, which he called a “found object”. Queen Elizabeth II opened the building on 20 October 1973.

In 1999 Utzon agreed to develop guidelines for future change. The Reception Hall reopened to his design as the Utzon Room in September 2004. A colonnade on the western side followed in 2006, and the building joined the World Heritage List on 28 June 2007.

Demolition and listing

Modern buildings often replaced older ones. The Hotel Australia was demolished in the early 1970s for Seidler’s MLC Centre. A competition scheme of the early 1960s proposed towers across The Rocks, keeping only the Maritime Services Board building and a relocated Cadmans Cottage. It did not proceed, partly because of economic conditions and partly because of a preservation movement reacting against the wholesale imposition of Modern Movement ideals. At McMahons Point, residents and architects including Seidler first opposed an industrial rezoning. Resident action then stopped the redevelopment plan that followed, and only Blues Point Tower of 1962 was built. It is now on the North Sydney heritage register.

The modern buildings then became vulnerable in turn.

An extraordinarily large number have been demolished and many innovative buildings of exceptional architectural quality have been lost in Central Sydney.

Modern Movement Architecture in Central Sydney: Heritage Study Review, City of Sydney, 2019

Losses include Seidler’s Lend Lease House, AGC House and the Goodsell Building. Woolley’s State Office Block was demolished in 1997 and replaced by Renzo Piano’s Aurora Place.

Such buildings can also be hard to conserve. Butyl caulking in glazing systems had a life of about 20 years, and asbestos has to be removed or sealed in. Replacing the whole curtain wall at Qantas House had been suggested; after investigation it was drained and resealed.

Listing has come gradually. Rose Seidler House joined the State Heritage Register in 1999. The house at Killara that Harry and Penelope Seidler built for themselves in 1966 to 1967 followed in 2008. After the 2019 study the City of Sydney proposed nine items for its local plan, among them Town Hall House, the MLC Centre, the William Bland Centre by Oser and Horwitz House, and the amendment was published in January 2021. Ministers twice declined to list Sirius in the 2010s, against the Heritage Council’s recommendation. The AMP Building joined the State Heritage Register in January 2025, and Seidler’s first apartment building, Ithaca Gardens of 1960 at Elizabeth Bay, was added in 2025.

Where to see it yourself

Sources

  1. Lumby / Tanner Kibble Denton Architects (2019), “Modern Movement Architecture in Central Sydney: Heritage Study Review”, City of Sydney
  2. City of Sydney, “Central Sydney planning: a history”, Central Sydney Planning Strategy, Context chapter
  3. Thalis & Cantrill (2008), “Built environment”, Dictionary of Sydney
  4. Ellmoos (2008), “Sydney Opera House”, Dictionary of Sydney
  5. Park (2008), “McMahons Point”, Dictionary of Sydney
  6. Dictionary of Sydney, “Seidler, Harry”
  7. Dictionary of Sydney, “Blues Point Tower”
  8. Docomomo Australia, “Rose Seidler House Group”
  9. Docomomo Australia, “Australia Square”
  10. Docomomo Australia, “AMP Building”
  11. Docomomo Australia, “Sydney Opera House”
  12. Docomomo Australia, “Audette House”
  13. Docomomo Australia, “Wentworth Memorial Chapel”
  14. Docomomo Australia, “Fisher Library”
  15. Docomomo Australia (2019), “Submit feedback on a proposal to heritage list 9 modern movement buildings and art”
  16. NSW Planning Portal, “Central Sydney Modern Movement Heritage Items”, PP-2020-735
  17. State Library of NSW, “Harry Seidler’s career”
  18. State Library of NSW, Seidler scrapbooks, “1949 to 1956”
  19. State Library of NSW, “Sydney Ancher”
  20. State Library of NSW, “Arthur Baldwinson”
  21. State Library of NSW, “Hugh Buhrich”
  22. National Portrait Gallery, “Harry Seidler, part two”, from a 1972 recording in the Hazel de Berg collection
  23. Sydney Opera House, “Jørn Utzon”
  24. Sydney Opera House, “Construction begins”
  25. Sydney Opera House, “Utzon departs the House”
  26. Sydney Opera House, “Peter Hall and the completion of the Opera House”
  27. Sydney Opera House, “Conserving and celebrating our heritage”
  28. Hawcroft (2009), “Migration and Modernism: Migrant Architects Practising Modern Architecture in Post War Sydney”, Australia ICOMOS, slides
  29. The Other Moderns, “About”
  30. Jackson (2019), “How the ‘Sydney School’ changed postwar Australian architecture”, The Conversation
  31. Wheeler (2015), “Vale Ken Woolley, 1933-2015”, ArchitectureAu
  32. Australian Design Centre, “State Office Block”, Endangered / Extinct
  33. Cheng (2017), “Sirius denied heritage protection, again”, ArchitectureAu
  34. ArchitectureAu (2025), “Seidler’s first apartment complex receives NSW heritage register listing”, ArchitectureAu
  35. Bradshaw (2025), “75 years ago this Wahroonga house stunned the North Shore”, North Shore Lorikeet
  36. Wikipedia, “Rose Seidler House”, reproducing the NSW State Heritage Register entry H00261 under CC BY 4.0
  37. Wikipedia, “Harry Seidler”, used for the details of his training and the 1952 appeal
  38. Wikipedia, “Sydney School”, used for the 1962 Dunphy article
  39. Wikipedia, “Harry and Penelope Seidler House”, for the 2008 register date
  40. Wikipedia, “AMP Building, Sydney”, citing the Sydney Morning Herald of 2 January 2025 for the listing
  41. Wikipedia, “Bauhaus”
  42. Wikipedia, “International Style”